Skip to content
Settings

Settings

Open via: Obsidian settings → Community plugins → Task Matrix. Settings mirror the view’s structure.

Interface

SettingDescription
Interface languageAutomatic (follow Obsidian) / Chinese / English

Scanning

SettingDefaultDescription
Scan folders500 Journal, 100 ProjectsComma-separated (full-width commas and semicolons work too), multi-level paths like 300 Resources/360 WorkMemos, matched case-insensitively; clear to scan the whole vault (slow on large vaults)
Excluded folders—Tasks here stay out of every view and count

Task markers

  • Completion markers / Cancelled markers: what the brackets must contain (defaults x / -);
  • Ignored markers: bracket contents that are not tasks at all;
  • Track completion date: adds ✅ YYYY-MM-DD on completion.

Display

  • Default view and open location;
  • Urgent window: how many days ahead counts as urgent (1–7);
  • Due-date range, completed-task range, hide tasks that start far ahead: how much gets laid out at once;
  • Show completed tasks without a due date.

New tasks

SettingDefaultDescription
Target note pathToday’s journalWhere new tasks go; supports {{title}}, {{date}}, {{time}}, and {{date:FORMAT}} placeholders; the note is created when missing; empty means the note you have open
Target headingemptyInsert under this heading; empty appends at the end
Journal template—The note copied when the target note doesn’t exist yet ({{title}} is its file name; <% … %> commands are left to Templater)

Note list

  • Group by folder (off by default): off — one container per note (the + in the container header adds a task to that note); on — containers sit under collapsible folder sections;
  • section names use the full path of your scan folders: a sub-folder added to the scan list becomes its own section, and everything below it stays there; without scan folders, each note’s own folder path is used.

GTD and matrix

Split into two halves — what decides the column, and what a drop writes. Only the tag vocabulary and the urgent window are adjustable; the rules themselves are stated on the settings page rather than offered as switches, because a switch that breaks classification or dragging is not a parameter.

Classification

  • Waiting tags and In-progress tags: the tags that decide the column (and the first entry is what a drop writes — one list for both, so a dropped task cannot bounce back);
  • Urgent days: how far ahead counts as urgent, deciding the urgent side of the matrix;
  • the rule order is listed right there: a dependency or waiting tag → Waiting; an in-progress tag → In progress; due date passed → Overdue; start date passed → In progress; start date ahead → To be started (folded into Inbox); otherwise Inbox.

Dragging

  • Enable dragging: the master switch. Off — containers stop accepting drops and cards cannot be dragged; the quick-move buttons and the Gantt context menu keep working. Everything below is disabled while it is off;
  • what a drop writes is fixed and spelled out (see the syntax page);
  • what each quadrant writes: one dropdown per quadrant for importance, limited to that quadrant’s own side — high and above for Q1/Q2, medium and below (or nothing) for Q3/Q4.

Calendar view

First day of week, weekends in the month and week views, whole month in the list view, and spreading in-progress tasks across their date range.

Gantt view

  • Days on bars: off / calendar days (inclusive) / workdays (sharing the same calendar as the shaded columns and the export);
  • Bar colors: one per Mermaid state (active / done / crit / everything else), typed as any CSS color or picked from swatches;
  • Task column width: also draggable right in the Gantt;
  • Diagram title and markers: the title line of the exported code, and the marker pair Write to note replaces between (default %% task-matrix:start %% … %% task-matrix:end %%). The today line, weekend marking, and the two date lists live on the preview tab so you can adjust them while looking at the diagram.

Public holiday schedule

Kept per year, because that is how holidays are announced: add a year, then fill in Holidays (10-01~10-07; ~ or 至; ranges may cross years) and Make-up workdays (working weekends). Ranges are expanded to individual dates on export (a Mermaid requirement). Whatever the Gantt spans is applied automatically; the preview-tab date fields are for one-off additions only.