Field Reference

Field Reference

Detection rules

The plugin scans only the scan folders in settings (default 100 Projects, multiple allowed; excludedFolders defaults to templates). A note inside them is recognized as a project when either:

  • its frontmatter has type: project, or
  • its tags include project.

Minimal working example:

---
type: project
status: active          # Chinese and English both work: 执行中 / active
start_date: 2026-01-01
due_date: 2026-03-31
---

Fields

The table lists the default field names; every one of them can be renamed in Settings → Field mapping (that’s the only place to touch when you switch templates).

FieldTypeDescription
statusenumProject status, see the table below; Chinese and English values both recognized
start_datedateStart date (YYYY-MM-DD)
due_datedateDue date
end_datedateFallback due date: read when due_date is missing
completion_datedateActual completion date
progressnumberProgress percentage 0–100
prioritynumberPriority 1–5, 1 highest: 1🔴 highest, 2🟠 high, 3🟡 medium, 4🔵 low, 5⚪ lowest
areatextThe project’s area, a single value (used for grouping and filtering); arrays in legacy notes read their first entry
objectivetextProject objective
contexttextBackground / context
remarkmultilineFree-form notes: status changes, decisions, blockers
project-leadertextProject leader
project-memberslistMembers
long-termbooleanLong-term project: stays off the Gantt chart and is exempt from every date filter; appears only in the left panel (pinned to the top)
main-projectbooleanMain-project flag: when a folder holds several project notes, the flagged one represents the group; more than one note with no flag raises a “multiple projects” hint
project-idtextProject ID
colorcolorCustom Gantt bar color (a CSS color); invalid values are ignored with a notice

Status values

Seven statuses with equivalent Chinese aliases (extensible in settings); the default order is the order of the create-dialog dropdown:

ValueChinese aliasMeaning
inbox未开始/待启动Not started
draft起草/构思中Drafting / ideating
active执行中In progress
on-hold暂停On hold
completed完成Completed
cancelled取消Cancelled (still drawn on the Gantt chart; hide it with the status filter)
archived归档Archived

Date fallbacks

When dates are incomplete, the Settings → Global fallback applies — by default offset by days (7):

  • due_date present, start_date missing → start = due − 7 days;
  • start_date present, due_date (and end_date) missing → due = start + 7 days;
  • neither present → the project stays off the chart, and the reason and count are shown at the top of the view.

Gantt bar colors

Four configurable classes: active blue, completed green, critical (priorities 1 / 2, drawn with an outline) red, other statuses muted. A note’s color field overrides the class for a single project.

The quick-project marker

A path segment named 快速项目 (configurable) has a special grouping meaning: group partitioning stops at that segment and titles join with " > “. Projects created through the new project dialog land under the 快速项目/ folder by default and form their own group.